Work done for a refinery:

  • 2 weeks of Process Hazard analysis for a hydrocracker plant in the refinery.
  • Work included training in all the 12 methods of PHA as well as using What If and Checklist method for doing the PHA for the hydrocracker plant.
  • Also included was to train other plant people so that they can do the PHA for the rest of the complex.
  • Period: July to Sept 2017

This was the biggest job done on process safety